This article contains information about the different inputs available for the Crane (CRANE). For other transport inputs, please see Transportation input overview.
General information
Input label | Mandatory | Description |
---|---|---|
Name | x | The official name of the transportation |
Crane capacity | The capacity is the maximal number of Pax which can be transferred with the transportation | |
Average speed | The average speed defines the maximum speed of the transportation (in km/h) | |
Radius | The radius is the maximum radius the crane can reach | |
Type | x | The type defines the kind of transportation. Depending on the type, different input boxes are available |
Base | x | The base is the harbour, airport or similar, used as the point of departure on the way to the base or as a base |
ID | The ID is of unique value to identify the transportation | |
Work package | The transport can be assigned to a certain work package |
Current location
Input label | Mandatory | Description |
---|---|---|
Latitude | The latitude where the transport is currently stationed | |
Longitude | The longitude where the transport is currently stationed |
Certificates
Input label | Mandatory | Description |
---|---|---|
Add certificate | List of certificates that can be assigned to the transport, after which you can select the certificate's validity | |
Certificate groups | Automatically assigned, depending on the certificate selected, as certificates can be assigned to certificate groups |
Required skills
Input label | Mandatory | Description |
---|---|---|
Add required skills | Qualification define which single or grouped qualification is necessary for every single technician to enter the transportation |
Required skill groups
Input label | Mandatory | Description |
---|---|---|
Add required skill groups | Qualification define which grouped qualification is necessary for every single technician to enter the transportation |
Costs
Input label | Mandatory | Description |
---|---|---|
Day rate | The day rate is the price of transportation per day | |
Fuel costs | The fuel costs are the price for every litre of fuel | |
Mobilisation cost | The mobilisation cost is the price per mobilisation |
Weather criteria
Input label | Mandatory | Description |
---|---|---|
Wind speed lifting limit | The wind speed lifting limit is the maximal wind for the |
Fuel consumption
Input label | Mandatory | Description |
---|---|---|
Total fuel consumption per day | The total fuel consumption per day is the averaged sum of fuel consumption per day (litre/day) |
Activity durations
Input label | Mandatory | Description |
---|---|---|
Mobilising time | The mobilising time per port visit is the averaged time that the crane needs to prepare in the base before it starts working | |
Demobilising time | The demobilising time per port visit is the averaged time that the cane needs to prepare in the base after finishing the work | |
Connection time | The connection time is the averaged time that the transport needs to get out of the usual transit in the position to transfer an employee | |
Disconnection time | The disconnection time is the averaged time that the transport needs to get out of the transfer position in the usual transit status |
Was this article helpful?
That’s Great!
Thank you for your feedback
Sorry! We couldn't be helpful
Thank you for your feedback
Feedback sent
We appreciate your effort and will try to fix the article